QCI worked with Boise City Canal Company personnel to develop a project scope, obtain project funding, coordinate with public agencies (Boise City, the Ada County Highway District, and the Capital City Development Corporation), and complete civil design drawings to reconstruct or slip line over 900 linear feet of main line canal with a design capacity of approximately 50 cubic feet per second. The slip line portion of this project was located beneath the Basque Block in downtown Boise. The design of this section was conceived to allow the reconstruction of the canal without disturbing the existing street improvements or disrupt access to the adjacent businesses.