Quadrant Consulting, Inc.
  • Home
  • Our Staff
  • Contact Us
  • Runoff Review

Big meadow creek culvert replacement project

Picture
Location
​Client
Date
​
Big Meadow Creek Culvert Replacement Project
​Idaho Department of Fish and Game
2016
​
Working with the Idaho Department of Fish & Game, Quadrant completed a fish passage assessment at four existing county road culverts on Big Meadow Creek in the vicinity of Troy, ID.  Following the completion of this assessment, Quadrant provided hydraulic analysis to design improvements to three of the four culverts to provide salmonid passage up to the 25-year runoff event.  Two culverts were 15’-10”-span multi-plate pipe arches, and one culvert was a 16’-span multi-plate single radius span with concrete footings.  Quadrant provided preliminary and final project design drawings, costs estimates, and bidding assistance for culvert procurement. 
​

Location

1904 W. Overland Rd.
​Boise, Idaho 83705

What Our Clients Are Saying

"Quadrant Consulting has a history of providing top notch services with the ability to quickly recognize problems, develop thoughtful and viable solutions, and are more than willing to assist in reaching a practical response to any task at hand."  - Rex Barrie, Boise River Watermaster

CONTACT US

Phone (208) 342-0091​
  • Home
  • Our Staff
  • Contact Us
  • Runoff Review