Quadrant Consulting, Inc.
  • Home
  • Our Staff
  • Contact Us
  • Runoff Review

east barber valley drive

Location
Date
​Cost

Harris Ranch Area
2005-2012
​>$100,000
QCI provided the civil design of East Barber Valley Drive in the Harris Ranch Area. We also performed the construction staking for the water and sewer mains and services, a new irrigation diversion on the Boise River and irrigation piping.  The civil engineering plans were coordinated with the on-going design of the East Parkcenter Bridge and an extensive floodplain mitigation plan for the Barber Valley site.​
​
QCI performed the base boundary/topographic survey (approximately 150 acres) for use in the design of the Marianne Williams Park and East Barber Valley Drive. In addition to staking the roadway (approximately 2,800 LF) and storm drain facilities, we performed the construction staking for the underground services, new diversion on the Boise River and irrigation piping.
 
Powered by Create your own unique website with customizable templates.
  • Home
  • Our Staff
  • Contact Us
  • Runoff Review