Quadrant Consulting, Inc.
  • Home
  • Our Staff
  • Contact Us
  • Runoff Review

Lemhi big springs creek bridge replacement

​Location
Date 
​Cost

Eagle Valley, Idaho
2008
​$400,000
Quadrant was assigned the task of conducting an engineering analysis on the bridge that was used to access fish screens.  Stapley Engineering was brought in to inspect the existing bridge, measure components, spans, ties, piers and other appurtenances.  The analysis was followed up with recommendations concerning structural integrity, retrofits and a replacement bridge. 

Location

1904 W. Overland Rd.
​Boise, Idaho 83705

What Our Clients Are Saying

"Quadrant Consulting has a history of providing top notch services with the ability to quickly recognize problems, develop thoughtful and viable solutions, and are more than willing to assist in reaching a practical response to any task at hand."  - Rex Barrie, Boise River Watermaster

CONTACT US

Phone (208) 342-0091​
  • Home
  • Our Staff
  • Contact Us
  • Runoff Review