Sager bank restoration project
Working together with the IDFG Salmon Regional office and Rick Sager, the local landowner and the Lemhi River Watermaster, Quadrant conducted the initial reconnaissance survey where the Lemhi River was creating new channel habitat and causing significant erosion to Mr. Sager's riparian property. Quadrant, in conjunction with Lemhi Environmental Consulting developed a bioengineered stream restoration habitat design to maintain channel habitat and stabilize the river bank. The plan provided in-stream habitat features while creating and enhancing lateral habitat, pools, and fisheries improvements. Quadrant also provided a project cost estimate and construction staking for the project.