Steve's projects range from hydrology to site engineering. His main projects include:
performing as District Engineer for both Boise River Flood Control District No. 10 (Boise to Caldwell) and Boise River Flood Control District No. 11 (Caldwell to Parma),
performing as District Engineer for Ada County Drainage District No. 3,
conducting a comprehensive irrigation diversion inventory of the Lower Boise and Payette Rivers,
performing hydraulic investigations, assisting in water rights acquisition,
preparing civil designs of roadways, bridges, drainage systems, water, sewer and utility facilities for projects in Idaho, Oregon, Washington, Nevada, California Wyoming and Alaska.
Since 1995, Steve has been active in the Upper Salmon River Screen, Passage and Restoration Program, working on both field surveying and engineering.
Steve has worked closely with local, state and federal regulatory agencies on his projects and continues to maintain close involvement with these agencies.